Cost effective data centers for mid-size clients



IDGA Editor
12/09/2010

A recent IDC survey found that for every US$1 spent on IT hardware, the power and cooling costs is 54 cents. In 2011, the energy costs are expected to rise to 74 cents. Listen to this podcast and find out how you can deploy a Scalable Modular data center in 8-12 weeks at up to 20% less overall cost than a traditional raised floor data center and save up to 30% on energy costs per year.
A recent IDC survey found that for every US$1 spent on IT hardware, the power and cooling costs is 54 cents. In 2011, the energy costs are expected to rise to 74 cents. Listen to this podcast and find out how you can deploy a Scalable Modular data center in 8-12 weeks at up to 20% less overall cost than a traditional raised floor data center and save up to 30% on energy costs per year.
To continue reading this story

Learn More   Existing Users